The paper presents the first cast-iron bridge built within the territories of pre-partition Poland, constructed in 1800 over the Bydgoszcz Canal. It was a single-span arch structure supported on masonry abutments of stone and brick. The span consisted of nine cast-iron openwork arch girders, each approximately 7.0 m long. The bridge remained in service for more than one hundred years. The paper discusses the structure's history, the surviving archival sources, and its role in the development of the earliest iron bridges in the Polish lands.
The article presents the development of cable-stayed bridges in China in recent decades and selected examples of the largest structures of this type. Basic structural parameters and solutions used in the longest cable-stayed bridges, including structures with record main span lengths, are discussed. A list of selected bridges together with their basic technical data is also presented. Based on the latest projects, the scale of development of Chinese bridge engineering and the directions for further increasing the span of cable-stayed structures are shown.
The study aims to provide a historical outline of changes in Polish regulations concerning moving load models for bridges in static strength analysis. As part of the study, a basic analysis of data from antiquity through the Middle Ages was conducted, followed by a more complex analysis considering the guidelines from the late 19th century to the present. Subsequently, a comparative analysis of the effects produced by particular load models was performed using a typical simple-span bridge. Based on this, conclusions are drawn regarding the safety levels and operational performance of bridges designed according to various regulations, as well as the trends in the evolution of load effects over time.
This article presents a composite bridge joint solution that reflects the trend of creating new forms of steel-concrete structures. It essentially represents an extension of the concrete crossbeam concept in composite bridges. It connects beam spans made of rolled I-section girders to a box-arch bridge without the use of steel profiles. The joint utilizes various types of connectors, including welded studs and circular holes cut in the webs (known as PBL in the past or CCD now).
The article presents a particular approach to modelling selected mechanical problems in bridge engineering using the finite element method. It relies on a plane description of the problem, but employs a polyspatial layered model, called as 2D+, which is an intermediate formulation between a typical plane (2D) and a three-dimensional (3D) model. This solution is distinguished by its high functionality resulting from a significant reduction in the numerical problem size compared to a 3D model, while still retaining its essential features. The practical possibilities of the layered modelling are described using several typical examples related to bridge structures, although its potential applications extend to many other areas of civil and mechanical engineering.
The article presents the results of a comprehensive technical review and geodetic measurements of the Karolin special suspension bridge over the Warta River in Poznań, which is a key element of the municipal heating main (4 pipes × Ø800 mm). The text describes the history of the facility's operation dating back to 1975 and the scope of renovation works carried out in 2024, after the second quarter of a century of operation. Particular emphasis was placed on the methodology of the five-year inspection and insightful, geodetic control measurements aimed at determining the evolution of the geometry of the structure over the years. The presented analyses, including the comparison of overhang arrows, deck elevation and deviations in the plan, lead to conclusions regarding the susceptibility of the structure to thermal and useful loads. On the basis of the minor irregularities detected, a number of maintenance recommendations were formulated, including proposals to improve the geometric monitoring system of this strategic element of the energy infrastructure.
The latest discovery by Chinese archaeologists concerning ancient bridge building technique is presented and discussed in detail. It concerns a pier cast of grey cast-iron in the current of the Shi'ting River in Sichuan Province, dating from the 1st century BC. The presented relic provides further confirmation of the effective use of iron in the construction of such structures in this area, predating similar European solutions by several centuries. The discussion is accompanied by an attempt to reconstruct the casting process itself, based on a detailed analysis of remnants of the foundry pit casing found in that place.
On 14 September 2024, the historic bridge was struck by a major flood wave caused by the failure of the earth embankment of a retention reservoir located on the Morawka River, a tributary of the Biała Lądecka River. The bridge sustained extensive damage. The restoration work was carried out in a manner that preserved the historic, original function and architectural form of the bridge. Efforts were made to uphold the principle of "honesty in architecture", meaning that the materials used for the reconstructed elements should be natural, but should not imitate the original material. This allowed for the visual preservation of the effects of the flood and the historical continuity of the structure.
Praca stanowi kolejną pozycję autorską poświęconą tematyce katastrof obiektów mostowych. Dokonano w niej przeglądu tego rodzaju zdarzeń, które wystąpiły na świecie w pierwszym ćwierćwieczu XXI wieku. Scharakteryzowano je według ich przyczyn (obiektywnych i subiektywnych) oraz skutków. Przedstawiono konkretne przykłady katastrof, zwracając szczególną uwagę na błędy ludzkie, które do nich doprowadziły. Najobszerniej zaprezentowano katastrofy mające miejsce w roku 2025, a więc najnowsze. Na podstawie własnej analizy sformułowano wnioski, które mogą być przydatne w mostownictwie, bo dotyczą bezpośrednio projektowania, budowy, remontów i modernizacji oraz utrzymania i sposobu eksploatacji obiektów i pozwalają na ograniczenie liczby katastrof oraz zmniejszenie skali ich następstw. Poruszono też kwestie odpowiedzialności za katastrofy, w tym odpowiedzialności ekspertów, przytaczając przykłady ich niewłaściwych decyzji, prowadzących do wystąpienia katastrofalnych zdarzeń.
The article describes the process of conducting analyses aimed at determining the suitability of the structural elements of a historical railway bridge for operation under current service conditions. The railway bridge over the Słupina River in Żukowo was constructed as part of railway line 201 connecting Silesia to the Port of Gdynia (1931). A single line was built, but the substructure was designed to accommodate a double-track line. As part of a comprehensive modernisation programme, line 201 is currently undergoing significant reconstruction, intended to meet contemporary requirements regarding loads and equipment. The bridge in Żukowo is a key element of the line. From the day the line was opened, the structure has remained in virtually unchanged condition. The analyses carried out by the Designer assumed that the concrete-and-stone piers would be retained (a condition imposed by the Heritage Conservator), that the spans would be replaced, and that a second track would be added. After commencing work, the Contractor raised a number of objections to the design and appointed an expert team from the Gdańsk University of Technology to assess the technical condition of the piers and evaluate their performance under the new operating conditions. The paper presents the investigations carried out, the computational analyses performed, and the conclusions drawn. As a result of the team's work, the piers were subjected to comprehensive revitalisation.
Offshore fixed structures, in accordance with the applicable building law regulations, require periodic inspections carried out by personnel holding appropriate qualifications and authorizations. Due to their location in the marine environment and their foundations fixed to the seabed, the execution of these inspections is subject to numerous technical and operational constraints. The most important of these arise from the fact that part of the structure is located below sea level and partly below the seabed surface, which limits direct access to critical components. This applies in particular to underwater structures and components embedded in the seabed, where standard visual examinations or conventional non‑destructive testing methods are impossible to perform or economically unjustified.
In addition to a practical approach to the development and updating of inspection plans, the paper also presents an analysis of what additional data and activities in subsequent service periods may realistically contribute to extending the service life of offshore structures and improving their safety level. Attention was also paid to the use of updated numerical models, which – when supplemented with inspection data and measurements of environmental conditions – enable a more precise determination of the degree of structural degradation. The paper also indicates how these data can be used when formulating conclusions and recommendations resulting from periodic construction inspections.
The paper evaluates the effectiveness of the General Method in the design of slender reinforced concrete frames with rigid beams. Based on a numerical analysis of systems with high-slenderness columns, it is demonstrated that a full non-linear approach accounts for load-bearing capacity reserves resulting from the global interaction between columns. For selected examples of RC frames, it is shown that advanced modeling significantly reduces the total steel consumption in columns (by up to 50%) compared to commonly used simplified methods.
The diversity in shaping the geometry of structural elements results from the architectural forms of buildings and their functions. One of the advantages of reinforced concrete monolithic structures is the possibility of giving them any geometric cross-sectional shape, which – from the point of view of the manufacturing process – entails varying time and labour consumption in the calculation of monolithic works on the construction site. The essence of calculating the rental of systemic, unified construction formwork is to determine the required time of their stay on the work front, during assembly, technological standstill (concrete mix binding process) and dismantling. These systems, as a price-determining component in monolithic works, constitute cost-intensive equipment units, therefore the appropriate selection of their quantity and determination of the lease period on the construction site is a very important issue, affecting the profitability of these works. The article analyzes the degree of variability of the dimensions of a monolithic element, reflecting its implementation costs on the construction site. The analysis was conducted based on a monolithic reinforced concrete beam constructed using system formwork with a complex formwork shape resulting from the structural design of the building.
The article analyzes the provisions concerning the design of composite strengthening of compressed concrete elements included in the new standard PN-EN 1992-1-1:2024-05. These provisions are compared with the authors’ own analytical models for the design (calculation) of strengthening systems. In the summary, recommendations that may (should) be applied are presented.
This article presents changes regarding the issue of confined concrete in light of the provisions of the newly introduced standard EN 1992-1-1:2023 Eurocode 2. The provisions of the modified standard are compared with the existing EN 1992-1-1:2004 and previous Polish regulations for confined columns. Analysis of the calculation procedures is illustrated with calculation examples. In one of the example, the confined concrete was used to calculate resistance of partially loaded areas.
The purpose of this study is to compare methods for inventorying office rooms and their equipment using the professional Leica BLK360 scanner and the iPhone 13 Pro smartphone equipped with LiDAR technology. The rationale for undertaking this research is the growing demand for fast and accurate methods of determining usable floor area, alongside the dynamic development of mobile 3D scanning systems as alternatives to professional solutions. The conducted analyses make it possible to assess the usefulness of the individual methods in inventory practice and to identify their limitations in the case of complex spatial layouts.
Design of composite reinforcements for compressed concrete elements according to PN-EN 1992-1-1:2024-05
- 1. Politechnika Wrocławska, Wydział Budownictwa Lądowego i Wodnego
- 2. w3t Pracownia Projektowa
Abstract
The article analyzes the provisions concerning the design of composite strengthening of compressed concrete elements included in the new standard PN-EN 1992-1-1:2024-05. These provisions are compared with the authors’ own analytical models for the design (calculation) of strengthening systems. In the summary, recommendations that may (should) be applied are presented.